1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators

Product Details:

Place of Origin: Jiangsu, China
Brand Name: XL
Certification: SGS
Model Number: XL-1300mm-EAC

Payment & Shipping Terms:

Minimum Order Quantity: 10/square meters
Price: $1.6-2/ meters
Packaging Details: Wooden,cartons,custom package
Delivery Time: 10 working days
Payment Terms: Western Union, T/T, MoneyGram, D/P, D/A, L/C
Supply Ability: 1000M/per pay
Get Best Price Contact Now

Detail Information

Width: 1300mm Cooling Type: Cooling Tower Parts
Material: PVC,CPVC Warranty: 1 Year
Name: PVC Cooling Tower Fill Pack Drift Eliminator PVC Filling Sheet Length: 2440mm/customized
Sheet Spacing: 20mm Usage: Cooling Tower
MOQ: 10/square Meters Material Thickness: 0.38-0.6mm
Highlight:

1300mm PVC Cooling Tower Fills

,

20mm PVC Cooling Tower Fills

,

cooling tower drift eliminators

Product Description

PVC Cooling Tower Fill Pack Drift Eliminator PVC Filling Sheet

Specifications:

 
Tech Date  
Sheet Width(mm) 1300mm
Sheet Length 1640mm/2440mm/customized
Thickness 0.38-0.6mm/customized
Sheet Spacing 20mm
Color grey/black

 

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.

 

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 0

 

 

Related Cooling Tower Film Fill

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 1

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 2

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 3

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 4

Our Company

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 5

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 6

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 7

 

1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators 8

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


If you have other questions, please feel free to contact us as below:

 
 

Want to Know more details about this product
I am interested in 1300mm PVC Cooling Tower Fills 20mm Cooling Tower Drift Eliminators could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.